
New Doors
The menusieres came today and installed the two new front doors in both gites.
I have been working alone for the last few days on the placo. I've
been doing all the fiddly bits, over doors, round the veluxes, the
window bays, etc. Lots and lots of small bits of plasterboard. I think
all the in-filling is going to take longer than putting up all the main
boards. The worst part is that as we approach the end of the placo
upstairs it means there is going to be days and days with a spatula in
hand filling all the joints and gaps.
It's got to the point upstairs that I carry a screwdriver round in my
pocket so I don't get trapped in a room cos none of the doors have door
handles yet.
