We visited the local quarry at Corseul today to order the hardcore (herrison) to replace the spoil dug out last week. My original plan was to use large gravel then a layer of sand on top to protect the waterproof membrane. The guy at the quarry suggested for under a dalle beton, concrete floor, using something called 0/30 primaire. I've seen it used under roads and it's a grey stone of various sizes with sand mixed in. Once a vibrating plate machine is run over it to compact everything down there is no need for the sand layer. The good news is that it is fairly inexpensive at about 8 euros per tonne (plus delivery!).
Calculating it out meant I needed 12 cubic meters, approx 18 tonnes, (quarry man said multiply by 1.5), BUT, a lorry load is only 15 tonnes ! So, just the one lorry, and maybe I'll chuck back in some of the rubble ripped out, or more concrete. My head hurts.