Link to todays posts Thursday, April 07, 2005

Outside complete

Latest gite picture. Click
for a bigger image.The outside of the new gites is finally finished. The last month or so has been hard physical work, but rewarding. Our aim was to get the outside finished before the start of the season so we are only about a week late, but Easter was early this year. Is that a good enough excuse ?

The last lorry load of gravel was spread yesterday after Ian and I finished laying the new patios. Driving the vibrating wacking machine over the pavers was noisy but quite good fun.

For the gite on the left I've built a ramp - lined with, I think, rather stylish granite edging stones - up to the doorway to allow for wheelchair access. The downstairs of this gite has a downstairs bedroom and bathroom en-suite with planned disabled facilities; wet room style shower, wall bars for the toilet etc.

Carolines painted the railings at the front, made up some trays of pansies and started planting up the flower beds. Hopefully I've given her enough time to get the beds established for the Summer.

|   6:57:11 PM  Use this to link to this item Outside complete   
April 2005
Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Mar   May

These are our experiences of running a gite business in Brittany, France. A gite is the French equivalent of a country holiday cottage. French culture, language, taxes and bureaucracy. Find out about our gites using the links on the LHS. This is our fourth season (2006) and we are looking forward to the summer. Stories about the road to this point will be added in due course. Renovation nightmares, builders, stress, schooling etc. Stay tuned.



Archives



Recent Posts


 4/7/07
 3/15/07
 2/21/07
 2/5/07
 1/6/07
 1/1/07
 12/24/06
 12/10/06
 11/30/06
 11/15/06
 11/1/06
 9/4/06
 8/20/06
 6/24/06
 6/15/06
 6/5/06
 5/27/06
 5/19/06
 5/12/06
 5/2/06
 5/1/06
 4/28/06
 4/27/06
 4/24/06
 4/21/06
 4/15/06