Living room and hall
With the floor finished the metal studwork has been built in the lounge, insulated using 100mm glass fibre with a vapour barrier.
The photo was taken a couple of days ago and the room has now been plasterboarded. There is also a wall for the hall that runs across separating the stairs and front door from the lounge. You can just see the edge of the wall as the camera position is in the hallway.
Yesterday I started taping and jointing the stairwell at the end of the hallway because the staircase guys are coming on Wednesday to fit the stairs. If I can get the stairwell prepared and an undercoat painted before then it will make life much easier protecting the stairs from dust and muck.
Once the staircase guys start, we can start work on the kitchen as they reckon it will take a couple of days to fit the staircase.
| 10:28:48 AM Living room and hall